ICB English | District heating pipeline
17536
page-template-default,page,page-id-17536,page-child,parent-pageid-17413,hazel-core-1.0.7,unselectable,ajax_fade,page_not_loaded,,select-theme-ver-4.7,wpb-js-composer js-comp-ver-6.8.0,vc_responsive

District heating pipeline:

 

Project planning and conception for the replacement of a main district heating transportation line on behalf of Kremsmüller GmbH. ICB contributed to the realization of the project with detail planning, pipestress calculation under EN13480, structural engineering and final documentation.

error: © icb-group