{"id":20388,"date":"2026-08-10T13:42:54","date_gmt":"2026-08-10T11:42:54","guid":{"rendered":"https:\/\/www.icb-group.org\/en\/?post_type=icb_media&#038;p=20388"},"modified":"2026-08-21T15:46:17","modified_gmt":"2026-08-21T13:46:17","slug":"planung-waermeauskoppelung","status":"publish","type":"icb_media","link":"https:\/\/www.icb-group.org\/en\/media\/planung-waermeauskoppelung\/","title":{"rendered":"Heat Recovery from a Biomass Boiler Plant"},"content":{"rendered":"<p>ICB provided the process design as well as the piping and plant engineering for heat recovery from the existing plant.nnThe design combines process engineering, routing, pipe stress and structural engineering in one coordinated technical basis.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Process design as well as piping and plant engineering for heat recovery from an existing plant.<\/p>\n","protected":false},"featured_media":0,"template":"","class_list":["post-20388","icb_media","type-icb_media","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/www.icb-group.org\/en\/wp-json\/wp\/v2\/icb_media\/20388","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.icb-group.org\/en\/wp-json\/wp\/v2\/icb_media"}],"about":[{"href":"https:\/\/www.icb-group.org\/en\/wp-json\/wp\/v2\/types\/icb_media"}],"wp:attachment":[{"href":"https:\/\/www.icb-group.org\/en\/wp-json\/wp\/v2\/media?parent=20388"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}