{"id":20355,"date":"2026-08-06T13:11:06","date_gmt":"2026-08-06T11:11:06","guid":{"rendered":"https:\/\/www.icb-group.org\/en\/project-stage\/documentation\/"},"modified":"2026-08-21T15:46:17","modified_gmt":"2026-08-21T13:46:17","slug":"documentation-handover","status":"publish","type":"icb_stage","link":"https:\/\/www.icb-group.org\/en\/project-phase\/documentation-handover\/","title":{"rendered":"Documentation &#038; Project Closeout"},"content":{"rendered":"<p>Documentation is understood as part of engineering rather than an administrative afterthought. ICB consolidates the actual as-built status and transfers the relevant technical information into a structured final project package.<\/p>\n<p>A reliable handover creates the basis for safe operation, maintenance and future plant modifications \u2013 and closes the information loop that began with the assessment.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Close the project with a reliable as-built status and controlled technical handover.<\/p>\n","protected":false},"featured_media":0,"menu_order":5,"template":"","class_list":["post-20355","icb_stage","type-icb_stage","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/www.icb-group.org\/en\/wp-json\/wp\/v2\/icb_stage\/20355","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.icb-group.org\/en\/wp-json\/wp\/v2\/icb_stage"}],"about":[{"href":"https:\/\/www.icb-group.org\/en\/wp-json\/wp\/v2\/types\/icb_stage"}],"wp:attachment":[{"href":"https:\/\/www.icb-group.org\/en\/wp-json\/wp\/v2\/media?parent=20355"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}