01
Project Lifecycle
Project stage 01
Assessment
Create a reliable technical basis before decisions are fixed.
01Assessment
02Concept
03Basic Engineering
04Detail Engineering
05Project Implementation
06Documentation & Handover
The assessment phase coordinates operations, maintenance, process requirements and available plant data. If ICB assumes project management, responsibilities, information flows and decision gates are defined from the outset.
01
Typical starting point
Existing conditions are unclear, documentation is incomplete, or an investment decision requires a verified technical basis.
Services
Engineering where it creates value in this stage.
The exact scope is configured for each project. The following areas represent the typical ICB scope within this project stage.
01
Site analysisn3D laser scanningnExisting documentationnTechnical due diligence
Engineering in Context

Existing
Engineering

Existing
Engineering
Results & deliverables
Concrete technical outputs.
01Verified as-built basis
02Defined project boundaries
03Point-cloud / survey data
04Technical findings and constraints
05Initial risk register
06Recommended next-step basis