35 t/h Steam Boiler Plant

 

Project planning and conceptualization of a 35 t/h steam boiler plant.

ICB project services:

 

  • Verification of permissible forces and moments in the piping system and at interfaces Layout and preliminary piping plan
  • 3D planning considering necessary classifications and pipe stress calculations according to EN 13480
  • Piping isometrics for prefabrication of piping components (adjusted to site conditions through on-site assembly)
  • Steel structure design and static analysis
  • Final documentation