35 t/h Steam Boiler Plant
Project planning and conceptualization of a 35 t/h steam boiler plant.
ICB project services:
- Verification of permissible forces and moments in the piping system and at interfaces Layout and preliminary piping plan
- 3D planning considering necessary classifications and pipe stress calculations according to EN 13480
- Piping isometrics for prefabrication of piping components (adjusted to site conditions through on-site assembly)
- Steel structure design and static analysis
- Final documentation