Planning of Plant Expansion

 

ICB supported the client in optimizing a biomass plant through:

 

  • 3D piping and facility layout planning
  • Pipe stress analysis according to EN 13480
  • Creation of piping isometrics
  • Piping and node analysis for steel structure design
  • Calculation of forces and moments at bearing points, equipment connections, and steel structures in the existing construction
  • Preparation of detailed and existing piping isometrics
  • Documentation according to DGRL (German Pressure Equipment Directive)