Documentation & Project Closeout
Close the project with a reliable as-built status and controlled technical handover.
01Concept
02Basic Engineering
03Detail Engineering
04Project Implementation
05Documentation & Project Closeout
ICB coordinates the final flow of information between engineering, suppliers, implementation and operations. Project management closes outstanding technical items and establishes a traceable handover status.
05
Typical starting point
Implementation is complete or well advanced and the final technical status needs to be consolidated for operation, conformity and future modifications.
Services
Engineering where it creates value in this phase.
The exact scope is configured for each project. The following areas represent the typical ICB scope within this project phase.
As-built documentation
CE documentation
Operating manuals
Final handover
Results & deliverables
Concrete technical outputs.
01Complete as-built package
02Updated plant model
03Final P&IDs and drawings
04CE / conformity documentation
05Operating and maintenance documentation
06Structured vendor documentation
07Final document register and handover package