04
Project Phases
Project phase 04
Project Implementation
Ensure technical continuity from procurement through construction to commissioning support.
01Concept
02Basic Engineering
03Detail Engineering
04Project Implementation
05Documentation & Project Closeout
Project management becomes particularly important during implementation. ICB can coordinate engineering, suppliers, contractors, the construction site and client interfaces within a controlled project structure.
04
Typical starting point
Engineering moves into procurement, fabrication and site implementation; supplier data, actual site conditions and changes need to remain technically controlled.
Services
Engineering where it creates value in this phase.
The exact scope is configured for each project. The following areas represent the typical ICB scope within this project phase.
Preparation of tender documents
Construction support (and management)
Design clarifications
Interface coordination
Change management
Construction acceptance / verification of construction work
Results & deliverables
Concrete technical outputs.
01Final tender documents at the start of implementation
02Technically evaluated bids
03Approved vendor documentation
04Resolved site queries
05Controlled design changes
06Updated engineering documentation
07Punch lists and technical handover documents
Engineering in Context
