Skip to content
02 Project Phases
Project phase 02

Basic Engineering

Translate the selected concept into a coordinated technical design basis.

Process engineering, mechanical, piping, civil/structural, electrical and instrumentation disciplines are coordinated at system level. Project management keeps decisions, responsibilities and review gates aligned across disciplines.

02
Typical starting point

The preferred option has been selected and now requires defined process data, layouts, equipment requirements and technical interfaces.

Services

Engineering where it creates value in this phase.

The exact scope is configured for each project. The following areas represent the typical ICB scope within this project phase.

Plot planning and layouts
Preliminary routing
PFD and P&ID
Specifications
Interface planning
3D laser scanning
Preparation of permitting documents
Results & deliverables

Concrete technical outputs.

01Approved Design Basis
02PFDs and P&IDs
03Equipment lists and data sheets
04Line lists
05Coordinated layouts
06Technical specifications
07Defined engineering interfaces
08Point cloud of the existing plant
09Final permitting documents
Engineering in Context
Contact

Engineering for the next project decision.

Discuss your project →