Skip to content
03 Project Phases
Project phase 03

Detail Engineering

Develop coordinated, buildable and verifiable detailed design.

ICB brings the engineering disciplines together in one coordinated design status. Design reviews, model coordination, vendor data and existing-plant constraints are treated as connected interfaces rather than separate work packages.

03
Typical starting point

The technical basis is defined and now needs to be translated into construction-ready models, drawings, calculations and specifications.

Services

Engineering where it creates value in this phase.

The exact scope is configured for each project. The following areas represent the typical ICB scope within this project phase.

Engineering in 2D/3D
Piping design
Pipe stress calculations according to EN 13480
Structural steel and structural analysis
Pressure vessel calculations
Results & deliverables

Concrete technical outputs.

01Coordinated 3D plant model
02Construction-ready layouts
03Piping isometrics
04Support documentation
05Pipe stress calculation reports
06Structural calculations and drawings
07Material take-offs
08Updated P&IDs and line lists
09Installation and fabrication documents
Engineering in Context
Existing
Engineering
2D Design
3D Model
Point Cloud
3D Model
Contact

Engineering for the next project decision.

Discuss your project →